AWG G3 PAD FOR PS3 Especificaciones Pagina 165

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 285
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 164
General Purpose Power Supply (GPDPS) 6 Device PowerSupply
System Reference, January 2001
165
4. Device stop: Wait time due to transient time of the
voltage controller and the resulting balancing currents
in the load capacitor.
There is no difference in the execution time for a firmware
command or test function, whether the test executes for
pass/fail results or for results by value.
Due to autoranging, the measurement time depends
heavily on the value to be measured.
NOTE If you require the highest measurement accuracy (in
current measure range 1, accuracy ±100nA±0.1%), the
maximum load capacitance must not exceed 1µF. This
means that, if the DPS is operating in a higher perfor-
mance range, you will need to switch to performance
range 1 to be able to reduce the capacitive load to 1µF.
The measurement operation sequences (3 and 5 in
Figure 76 on page 164 ) is expanded in the figure below.
Figure77 Measurement Operation Sequence
1. Before the current measurement, the measurement
path will be set (operating current: 300 mA–average,
IDDQ: 100 µA–average).
2. If the measurement path is switched by the hardware,
a wait time is required.
time
set
voltage
measure
path
wait
for
settle
measure
voltage
set
current
measure
path
wait for measure
path to settle
perform
single
measurement
perform n–1
samples and
calculate
n-average
12 3 4
operating current
measurement only
if set already
if wrong range
Vista de pagina 164
1 2 ... 160 161 162 163 164 165 166 167 168 169 170 ... 284 285

Comentarios a estos manuales

Sin comentarios